L00002MWWA: UPM Shotton Paper Boiler 7 (RA) - A, D

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2006/2007 (4) 16,650 71.9% * 34,785 0
2007/2008 16,650 80.8% 118,232 0
2008/2009 16,650 84.0% 122,489 0
2009/2010 16,650 86.2% 125,740 0
2010/2011 16,650 82.9% 120,974 0
2011/2012 16,650 82.2% 120,273 0
2012/2013 16,650 86.7% 126,404 0
2013/2014 (11) 16,650 94.1% * 125,998 0
2014/2015 16,650 91.6% 133,651 0
2015/2016 (4) 16,650 84.5% * 41,172 0
Annual Totals to end Jul-15 126,4120
Rolling Load Factor84.9 %
Annual Load Factor to end Jul-1586.7 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.