G00472HYSC: Tummel Power Station

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2004/2005 34,000 55.3% 164,640 0
2005/2006 34,000 43.6% 129,987 0
2006/2007 34,000 53.1% 158,190 0
2007/2008 34,000 38.7% 115,711 0
2008/2009 34,000 44.0% 131,006 0
2009/2010 34,000 42.2% 125,796 0
2010/2011 34,000 38.1% 113,607 0
2011/2012 34,000 59.8% 178,512 0
2012/2013 34,000 38.5% 114,631 0
2013/2014 34,000 51.0% 152,020 0
2014/2015 34,000 50.7% 151,004 0
2015/2016 34,000 55.2% 164,806 0
2016/2017 (7) 34,000 29.6% * 51,729 0
Annual Totals to end Oct-16 151,9640
Rolling Load Factor46.7 %
Annual Load Factor to end Oct-1650.9 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.