GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2004/2005 152,500 11.4% 152,914 0
2005/2006 152,500 9.2% 122,888 0
2006/2007 152,500 11.1% 148,123 0
2007/2008 152,500 9.7% 129,391 0
2008/2009 152,500 9.3% 123,661 0
2009/2010 152,500 9.5% 127,268 0
2010/2011 152,500 8.3% 110,851 0
2011/2012 152,500 13.8% 184,218 0
2012/2013 152,500 8.5% 113,367 0
2013/2014 152,500 12.0% 160,777 0
2014/2015 152,500 10.2% 136,770 0
2015/2016 (11) 152,500 11.7% * 143,708 0
2016/2017 (7) 152,500 7.9% * 61,490 0
Annual Totals to end Oct-16 153,7590
Rolling Load Factor10.2 %
Annual Load Factor to end Oct-1611.5 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.