RO Period Capacity (kW) Load Factor MWh ROCs
2004/2005 44,100 63.1% 243,890 0
2005/2006 44,100 46.0% 177,651 0
2006/2007 44,100 56.7% 219,021 0
2007/2008 44,100 50.5% 195,542 0
2008/2009 44,100 49.2% 189,891 0
2009/2010 44,100 48.5% 187,328 0
2010/2011 44,100 40.7% 157,293 0
2011/2012 44,100 66.6% 257,832 0
2012/2013 44,100 39.4% 152,348 0
2013/2014 44,100 52.7% 203,618 0
2014/2015 44,100 59.0% 227,734 0
2015/2016 44,100 62.4% 241,829 0
2016/2017 (7) 44,100 41.5% * 94,054 0
Annual Totals to end Oct-16 222,4040
Rolling Load Factor52.0 %
Annual Load Factor to end Oct-1657.4 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.