G00478HYSC: Glenmoriston Power Station

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2004/2005 37,800 46.7% 154,472 0
2005/2006 37,800 43.6% 144,387 0
2006/2007 37,800 50.8% 168,156 0
2007/2008 37,800 48.4% 160,865 0
2008/2009 37,800 46.7% 154,787 0
2009/2010 37,800 39.4% 130,547 0
2010/2011 37,800 30.5% 100,980 0
2011/2012 37,800 58.4% 193,868 0
2012/2013 37,800 36.8% 121,779 0
2013/2014 37,800 45.4% 150,281 0
2014/2015 37,800 49.2% 162,991 0
2015/2016 37,800 51.7% 171,503 0
2016/2017 (6) 37,800 30.6% * 51,128 0
Annual Totals to end Oct-16 147,2260
Rolling Load Factor45.3 %
Annual Load Factor to end Oct-1644.3 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.