G00479HYSC: Fasnakyle power Station

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2004/2005 69,000 50.0% 302,415 0
2005/2006 69,000 34.3% 207,341 0
2006/2007 69,000 52.3% 315,968 0
2007/2008 69,000 49.1% 297,866 0
2008/2009 69,000 32.4% 195,814 0
2009/2010 69,000 30.6% 184,940 0
2010/2011 69,000 22.1% 133,577 0
2011/2012 69,000 46.8% 283,483 0
2012/2013 (10) 69,000 20.5% * 103,800 0
2013/2014 69,000 37.5% 226,634 0
2014/2015 69,000 36.6% 221,444 0
2015/2016 69,000 38.6% 233,840 0
2016/2017 (7) 69,000 20.4% * 72,122 0
Annual Totals to end Oct-16 213,5640
Rolling Load Factor36.3 %
Annual Load Factor to end Oct-1635.2 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.