G00863MWEN: Copyhold Works (Lakeside)

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2009/2010 (3) 37,000 29.9% * 23,862 0
2010/2011 37,000 47.0% 152,316 0
2011/2012 37,000 47.0% 152,640 0
2012/2013 37,000 53.1% 172,042 0
2013/2014 42,000 41.6% 143,063 0
2014/2015 42,000 44.8% 164,706 0
2015/2016 42,000 43.0% 158,659 0
2016/2017 42,000 37.1% 136,623 0
2017/2018 (8) 42,000 46.7% * 114,807 0
Annual Totals to end Nov-17 162,2580
Rolling Load Factor44.8 %
Annual Load Factor to end Nov-1744.1 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.