G00872MWEN: Edmonton Energy From Waste Plant

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2002/2003 55,000 26.1% 125,869 0
2003/2004 55,000 22.5% 108,713 0
2004/2005 55,000 23.4% 112,662 0
2005/2006 (11) 55,000 20.3% * 89,652 0
2006/2007 55,000 24.4% 117,334 0
2007/2008 55,000 23.6% 113,871 0
2008/2009 55,000 27.2% 131,125 0
2009/2010 55,000 19.1% 91,801 0
2010/2011 55,000 25.1% 121,130 0
2011/2012 55,000 28.0% 135,277 0
2012/2013 55,000 28.2% 136,086 0
2013/2014 55,000 28.6% 137,920 0
2014/2015 55,000 31.0% 148,651 0
2015/2016 52,700 32.1% 148,457 0
2016/2017 (8) 52,700 30.7% * 94,718 0
Annual Totals to end Nov-16 145,1780
Rolling Load Factor25.6 %
Annual Load Factor to end Nov-1631.4 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.