GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2008/2009 (5) 100,000 21.0% * 76,135 76,135
2009/2010 (5) 101,150 10.7% * 39,631 39,631
2012/2013 (8) 101,150 17.2% * 101,340 101,340
2013/2014 101,150 22.2% 196,405 196,405
2014/2015 101,150 22.0% 194,768 194,768
2015/2016 101,150 24.1% 214,523 214,523
2016/2017 (7) 101,150 14.5% * 75,083 66,699
Annual Totals to end Oct-16 204,623196,239
Rolling Load Factor12.1 %
Annual Load Factor to end Oct-1623.0 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.