R00002RAWA G00680BWWA : Western Wood Energy Plant A

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2008/2009 (9) 14,200 64.9% * 60,573 60,573
2009/2010 16,400 79.9% 113,604 113,604
2010/2011 16,400 76.5% 109,964 109,964
2011/2012 16,400 81.5% 117,366 117,366
2012/2013 16,400 65.5% 94,058 94,058
2013/2014 16,400 83.4% 119,806 119,806
2014/2015 16,400 77.0% 110,591 110,591
2015/2016 16,400 84.4% 121,542 121,542
2016/2017 (7) 16,400 81.7% * 68,775 58,219
Annual Totals to end Oct-16 121,473110,917
Rolling Load Factor78.5 %
Annual Load Factor to end Oct-1684.3 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.