R00005RPEN G00510FWEN : Scroby Sands Wind Farm

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2004/2005 (9) 60,000 23.5% * 92,667 92,667
2005/2006 60,000 27.0% 141,893 141,893
2006/2007 60,000 25.9% 136,054 136,054
2007/2008 60,000 28.1% 148,189 148,189
2008/2009 60,000 27.0% 141,961 141,961
2009/2010 60,000 32.3% 169,963 169,963
2010/2011 60,000 28.0% 147,295 147,295
2011/2012 60,000 33.0% 173,755 173,755
2012/2013 60,000 34.4% 180,698 180,698
2013/2014 60,000 35.5% 186,651 186,651
2014/2015 60,000 32.6% 171,474 171,474
2015/2016 60,000 35.7% 187,900 187,900
2016/2017 (7) 60,000 26.0% * 80,031 65,699
Annual Totals to end Oct-16 185,813171,481
Rolling Load Factor30.7 %
Annual Load Factor to end Oct-1635.3 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.