R00005SASC G01072BWSC : Stevens Croft - A, B, C, D, E, (01/06/07)

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2007/2008 (5) 50,400 42.6% * 71,482 71,442
2008/2009 50,400 63.5% 258,639 258,639
2009/2010 (11) 50,400 52.6% * 211,263 317,364
2010/2011 50,400 63.2% 278,957 419,156
2011/2012 50,400 61.5% 272,443 528,724
2012/2013 (11) 50,725 71.7% * 291,512 583,023
2013/2014 50,725 75.1% 333,504 667,008
2014/2015 50,725 73.2% 325,360 650,721
2015/2016 50,725 74.4% 331,428 662,856
2016/2017 (7) 50,725 63.6% * 165,717 261,914
Annual Totals to end Oct-16 313,819558,118
Rolling Load Factor65.1 %
Annual Load Factor to end Oct-1670.4 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.