R00006RAWA G00683BWWA : UPM Shotton Paper Boiler 7 (RA) - A, D

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2006/2007 (4) 19,655 59.5% * 33,962 33,962
2007/2008 19,655 68.5% 118,234 118,234
2008/2009 19,655 71.1% 122,488 122,488
2009/2010 19,655 72.5% 124,750 234,438
2010/2011 19,655 69.8% 120,264 240,529
2011/2012 19,655 69.5% 120,043 240,086
2012/2013 19,655 64.1% 110,286 215,321
2013/2014 (11) 19,655 68.1% * 107,678 215,355
2014/2015 19,655 63.7% 109,724 219,448
2015/2016 19,655 65.2% 112,560 225,119
2016/2017 (7) 19,655 68.1% * 68,720 111,477
Annual Totals to end Oct-16 117,456208,951
Rolling Load Factor67.4 %
Annual Load Factor to end Oct-1668.0 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.