R00006RPEN G00868FWEN : Kentish Flats Ltd - A,C

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2005/2006 (9) 90,000 26.2% * 155,253 155,253
2006/2007 90,000 25.9% 204,245 204,245
2007/2008 90,000 29.1% 229,726 229,726
2008/2009 90,000 30.3% 238,559 238,559
2009/2010 90,000 30.7% 242,314 242,314
2010/2011 90,000 31.3% 247,075 247,075
2011/2012 90,000 33.5% 264,528 264,528
2012/2013 90,000 34.1% 268,830 268,830
2013/2014 90,000 36.0% 283,568 283,568
2014/2015 90,000 30.4% 239,645 239,645
2015/2016 90,000 35.6% 281,277 281,277
2016/2017 (7) 90,000 22.6% * 104,510 86,201
Annual Totals to end Oct-16 262,018243,709
Rolling Load Factor31.6 %
Annual Load Factor to end Oct-1633.1 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.