R00006SASC G01077BWSC : Caledonian CHP1

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2009/2010 (11) 26,043 74.1% * 155,062 310,123
2010/2011 26,043 78.4% 178,922 357,843
2011/2012 26,043 81.2% 185,858 371,716
2012/2013 26,043 77.0% 175,680 351,361
2013/2014 26,043 73.2% 167,088 334,177
2014/2015 26,043 78.6% 179,204 358,408
2015/2016 (11) 26,043 80.5% * 168,961 337,922
2016/2017 (7) 26,043 77.8% * 103,997 170,546
Annual Totals to end Oct-16 179,610321,771
Rolling Load Factor76.5 %
Annual Load Factor to end Oct-1678.5 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.