R00007RAEN G00017BWEN : Thetford Power Station (RA) - A B

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2002/2003 41,500 73.8% 268,338 268,338
2003/2004 41,500 72.5% 264,292 264,292
2004/2005 41,500 72.5% 263,685 263,685
2005/2006 41,500 59.4% 215,813 215,813
2006/2007 41,500 52.9% 192,304 192,304
2007/2008 41,500 63.3% 230,625 230,625
2008/2009 41,500 71.5% 260,092 260,092
2009/2010 41,500 66.0% 239,947 359,903
2010/2011 41,500 68.4% 248,790 373,166
2011/2012 44,200 62.9% 244,154 366,213
2012/2013 44,200 60.7% 235,158 352,719
2013/2014 44,200 64.3% 249,084 373,608
2014/2015 44,200 66.9% 258,879 388,299
2015/2016 44,200 69.4% 269,619 404,408
2016/2017 (6) 44,200 68.0% * 132,102 198,143
Annual Totals to end Sep-16 274,982412,453
Rolling Load Factor65.9 %
Annual Load Factor to end Sep-1670.8 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.