R00008SASC G01088BWSC : Markinch CHP

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2013/2014 (2) 61,625 10.7% * 9,368 14,498
2014/2015 61,625 46.8% 252,492 504,984
2015/2016 61,625 57.7% 312,499 624,998
2016/2017 61,625 67.8% 365,806 731,612
2017/2018 (8) 61,625 66.0% * 238,238 320,575
Annual Totals to end Nov-17 375,092594,282
Rolling Load Factor58.9 %
Annual Load Factor to end Nov-1769.5 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.