R00011RPEN G01155FWEN : Inner Dowsing Offshore Wind Farm

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2008/2009 (10) 97,200 28.9% * 204,922 204,922
2009/2010 97,200 35.3% 300,898 451,325
2010/2011 97,200 34.4% 293,088 439,610
2011/2012 97,200 31.2% 266,202 399,283
2012/2013 97,200 35.9% 305,855 458,760
2013/2014 97,200 37.4% 318,165 477,224
2014/2015 (11) 97,200 35.5% * 277,607 416,389
2015/2016 97,200 35.2% 300,246 450,346
2016/2017 (8) 97,200 27.9% * 158,581 164,743
Annual Totals to end Nov-16 275,860340,652
Rolling Load Factor34.4 %
Annual Load Factor to end Nov-1632.3 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.