R00012RPEN G01156FWEN : Gunfleet Sands I

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2009/2010 (5) 108,000 20.0% * 78,403 117,598
2010/2011 108,000 30.9% 292,169 438,232
2011/2012 108,000 35.1% 333,072 499,583
2012/2013 108,000 36.0% 340,707 511,035
2013/2014 108,000 37.4% 353,731 530,570
2014/2015 108,000 32.4% 306,947 460,398
2015/2016 108,000 39.3% 373,260 559,862
2016/2017 108,000 31.9% 301,610 452,392
2017/2018 (9) 108,000 32.3% * 230,141 239,345
Annual Totals to end Dec-17 324,113380,296
Rolling Load Factor34.6 %
Annual Load Factor to end Dec-1734.3 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.