R00013RBEN G00360BWEN : Tilbury Power Station - A,C,E

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2004/2005 (5) 2,159 29.6% * 5,602 5,602
2005/2006 13,531 29.6% 35,101 35,101
2006/2007 23,058 29.6% 59,817 59,817
2007/2008 3,445 29.6% 8,936 8,936
2008/2009 (1) 35 30.0% * 92 92
2009/2010 (6) 3,427 27.1% * 8,130 4,065
2010/2011 16,746 29.5% 43,286 21,643
2012/2013 (11) 1,106,678 29.6% * 2,870,910 0
2013/2014 (5) 650,371 29.6% * 1,687,180 0
Annual Totals to end Aug-13 4,328,8300
Rolling Load Factor20.0 %
Annual Load Factor to end Aug-1329.6 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.