R00013RBEN G00360BWEN : Tilbury Power Station - A,C,E

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2004/2005 (5) 2,158 29.6% * 5,602 5,602
2005/2006 13,522 29.6% 35,101 35,101
2006/2007 23,043 29.6% 59,817 59,817
2007/2008 3,442 29.6% 8,936 8,936
2008/2009 (1) 35 30.0% * 92 92
2009/2010 (6) 3,387 27.4% * 8,130 4,065
2010/2011 16,896 29.2% 43,286 21,643
Annual Totals to end Mar-11 43,28621,643
Rolling Load Factor21.6 %
Annual Load Factor to end Mar-1129.3 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.