R00013RPEN G01157FWEN : Gunfleet Sands II

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2009/2010 (8) 64,800 29.0% * 109,689 164,526
2010/2011 64,800 33.1% 188,100 282,136
2011/2012 64,800 35.6% 202,702 304,038
2012/2013 64,800 36.9% 209,198 313,781
2013/2014 64,800 39.4% 223,641 335,445
2014/2015 64,800 33.4% 189,371 284,042
2015/2016 64,800 42.1% 239,793 359,672
2016/2017 (8) 64,800 30.8% * 116,886 121,324
Annual Totals to end Nov-16 226,666285,986
Rolling Load Factor36.5 %
Annual Load Factor to end Nov-1639.8 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.