R00014RPEN G01158FWEN : Greater Gabbard

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2010/2011 (1) 504,000 0.7% * 2,710 0
2011/2012 504,000 11.3% 499,008 696,257
2012/2013 504,000 33.4% 1,475,040 2,950,070
2013/2014 504,000 44.0% 1,941,400 3,882,800
2014/2015 504,000 39.2% 1,729,220 3,458,430
2015/2016 504,000 46.6% 2,064,470 4,128,940
2016/2017 (7) 504,000 31.9% * 826,206 1,417,560
Annual Totals to end Oct-16 1,981,0603,727,270
Rolling Load Factor37.1 %
Annual Load Factor to end Oct-1644.8 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.