R00022RPEN G01165FWEN : Sheringham Shoal

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2011/2012 (7) 317,000 2.4% * 38,614 39,777
2012/2013 317,000 29.5% 818,279 1,636,560
2013/2014 317,000 41.6% 1,155,750 2,311,500
2014/2015 317,000 38.0% 1,056,480 2,112,950
2015/2016 317,000 42.1% 1,172,580 2,345,150
2016/2017 (7) 317,000 27.0% * 438,906 823,477
Annual Totals to end Oct-16 1,122,7302,191,130
Rolling Load Factor36.6 %
Annual Load Factor to end Oct-1640.3 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.