R00022SESC G00314HYSC : Mossford Power Station - A,G

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2002/2003 (2) 18,600 27.3% * 7,186 7,186
2003/2004 18,600 67.8% 110,742 110,742
2004/2005 18,600 72.0% 117,388 117,388
2005/2006 18,600 77.4% 126,117 126,117
2006/2007 18,660 76.8% 125,611 125,611
2007/2008 18,660 75.7% 124,088 124,088
2008/2009 18,660 75.5% 123,428 123,428
2009/2010 18,660 69.0% 112,549 112,549
2010/2011 18,600 64.5% 105,171 105,171
2011/2012 18,600 83.3% 136,130 136,130
2012/2013 18,600 75.5% 122,978 122,978
2013/2014 18,600 72.5% 118,124 118,124
2014/2015 18,600 76.9% 125,223 125,223
2015/2016 18,600 80.4% 131,356 131,356
2016/2017 (7) 18,600 65.1% * 62,149 56,646
Annual Totals to end Oct-16 126,727121,224
Rolling Load Factor74.9 %
Annual Load Factor to end Oct-1677.6 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.