R00026RAEN G00275BWEN : Slough Electricity Contracts Ltd - C (RB)

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2002/2003 35,000 23.8% 72,938 72,938
2003/2004 35,000 32.0% 98,433 98,433
2004/2005 35,000 47.7% 146,147 146,147
2005/2006 35,000 57.5% 176,295 176,295
2006/2007 35,000 54.1% 165,788 165,788
2007/2008 (11) 35,000 49.0% * 137,964 137,964
2008/2009 35,000 33.6% 103,057 103,057
2009/2010 35,000 44.0% 134,769 204,020
2010/2011 35,000 45.9% 140,799 214,449
2011/2012 35,000 32.5% 100,028 151,523
2012/2013 (11) 35,000 36.7% * 103,197 155,975
2013/2014 (11) 35,000 6.7% * 18,783 26,627
2014/2015 (1) 35,000 8.5% * 2,152 3,346
Annual Totals to end Apr-14 19,78329,973
Rolling Load Factor40.0 %
Annual Load Factor to end Apr-146.5 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.