R00027NQNI G00036NWNI : Slieve Rushen Phase II - A (23/10/2007)

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2007/2008 (6) 54,000 17.0% * 40,257 40,257
2008/2009 54,000 33.9% 160,206 160,206
2009/2010 54,000 33.3% 157,497 157,497
2010/2011 54,000 31.3% 148,258 148,258
2011/2012 54,000 38.1% 180,582 180,582
2012/2013 54,000 27.3% 129,021 129,021
2013/2014 54,000 39.0% 184,689 184,689
2014/2015 54,000 35.6% 168,577 168,577
2015/2016 54,000 34.7% 164,488 164,488
2016/2017 (7) 54,000 27.6% * 76,540 64,855
Annual Totals to end Oct-16 152,590140,905
Rolling Load Factor34.0 %
Annual Load Factor to end Oct-1632.2 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.