R00027RPEN G01171FWEN : West of Duddon Sands Offshore Wind Farm

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2013/2014 (2) 388,800 4.7% * 25,706 51,412
2014/2015 388,800 35.1% 1,196,660 2,393,320
2015/2016 388,800 42.4% 1,449,260 2,898,510
2016/2017 (6) 388,800 37.5% * 640,103 1,280,210
Annual Totals to end Sep-16 1,427,9702,855,950
Rolling Load Factor41.6 %
Annual Load Factor to end Sep-1641.8 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.