R00028RPEN G01172FWEN : Westermost Rough

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2014/2015 (6) 210,000 7.4% * 68,197 128,591
2015/2016 210,000 41.5% 766,070 1,532,140
2016/2017 (8) 210,000 41.6% * 511,148 726,973
Annual Totals to end Nov-16 863,4461,431,570
Rolling Load Factor39.8 %
Annual Load Factor to end Nov-1646.8 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.