RO Period Capacity (kW) Load Factor MWh ROCs
2007/2008 (7) 35,220 40.5% * 72,986 72,986
2008/2009 35,220 60.3% 186,078 186,078
2009/2010 35,220 123.6% 197,494 321,026
2010/2011 17,450 118.5% 181,136 362,273
2011/2012 35,220 64.4% 199,362 317,761
2012/2013 (9) 35,220 56.2% * 130,163 212,116
2013/2014 35,220 55.5% 171,151 302,828
2014/2015 35,220 64.2% 198,202 367,558
2015/2016 35,220 67.9% 209,964 419,928
2016/2017 (6) 35,220 67.4% * 104,330 171,145
Annual Totals to end Oct-16 185,398333,281
Rolling Load Factor73.9 %
Annual Load Factor to end Oct-1659.9 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.