R00058SESC G00302HYSC : Shin Power Station-A,G

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2003/2004 (9) 18,620 74.8% * 91,945 91,945
2004/2005 18,620 87.2% 142,252 121,884
2005/2006 18,620 81.4% 132,728 123,176
2006/2007 18,620 76.7% 125,171 125,171
2007/2008 18,620 89.5% 146,435 146,435
2008/2009 18,620 79.8% 130,154 130,154
2009/2010 18,620 81.6% 133,035 133,035
2010/2011 18,620 70.1% 114,397 114,397
2011/2012 18,640 79.0% 129,422 129,422
2012/2013 18,640 80.9% 132,051 132,051
2013/2014 18,620 56.6% 92,362 92,362
2014/2015 18,620 54.5% 88,906 88,906
2015/2016 18,620 86.0% 140,621 140,621
2016/2017 (7) 18,620 73.5% * 70,309 62,746
Annual Totals to end Oct-16 137,123129,560
Rolling Load Factor77.1 %
Annual Load Factor to end Oct-1683.8 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.