RO Period Capacity (kW) Load Factor MWh ROCs
2004/2005 (1) 96,600 2.7% * 1,914 1,914
2005/2006 96,600 19.9% 168,471 168,471
2006/2007 124,200 24.8% 269,294 269,294
2007/2008 124,200 24.1% 263,370 263,370
2008/2009 124,200 23.0% 249,740 249,740
2009/2010 124,200 19.2% 208,834 208,834
2010/2011 124,200 17.9% 194,406 194,406
2011/2012 124,200 25.4% 276,889 276,889
2012/2013 124,200 18.1% 196,655 196,655
2013/2014 124,200 25.2% 274,440 274,440
2014/2015 124,200 19.0% 206,791 206,791
2015/2016 124,200 16.2% 176,677 176,677
2016/2017 (7) 124,200 11.9% * 76,199 68,476
Annual Totals to end Oct-16 173,971166,248
Rolling Load Factor21.2 %
Annual Load Factor to end Oct-1615.9 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.