R00063SQSC G00734NWSC : Hadyard Hill Windfarm - A,C

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2005/2006 (2) 119,600 11.3% * 19,077 19,077
2006/2007 119,600 26.8% 280,864 280,864
2007/2008 119,600 25.3% 265,926 265,926
2008/2009 119,600 25.2% 264,166 264,166
2009/2010 119,600 24.3% 254,529 254,529
2010/2011 119,600 19.8% 207,640 207,640
2011/2012 119,600 27.5% 288,858 288,858
2012/2013 119,600 22.1% 231,472 231,472
2013/2014 119,600 25.4% 266,394 266,394
2014/2015 119,600 20.1% 210,601 210,601
2015/2016 119,600 21.5% 225,686 225,686
2016/2017 (7) 119,600 15.3% * 93,916 79,263
Annual Totals to end Oct-16 205,802191,149
Rolling Load Factor23.7 %
Annual Load Factor to end Oct-1619.6 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.