R00066SQSC G00685NWSC : Pauls Hill Wind Farm - A,C,E

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2005/2006 (4) 64,400 11.6% * 21,682 21,682
2006/2007 64,400 32.8% 185,151 185,151
2007/2008 64,400 34.1% 192,989 192,989
2008/2009 64,400 32.9% 185,415 185,415
2009/2010 64,400 27.7% 156,334 156,334
2010/2011 64,400 26.9% 151,752 151,752
2011/2012 64,400 36.6% 207,297 207,297
2012/2013 64,400 27.1% 152,662 152,662
2013/2014 64,400 36.6% 206,349 206,349
2014/2015 64,400 31.5% 177,684 177,684
2015/2016 64,400 31.4% 177,400 177,400
2016/2017 (7) 64,400 22.9% * 75,800 65,337
Annual Totals to end Oct-16 168,633158,170
Rolling Load Factor31.7 %
Annual Load Factor to end Oct-1629.8 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.