RO Period Capacity (kW) Load Factor MWh ROCs
2008/2009 (10) 50,000 24.5% * 89,547 89,547
2009/2010 65,000 24.9% 138,328 138,328
2010/2011 65,000 23.2% 131,977 131,977
2011/2012 65,000 35.4% 202,112 202,112
2012/2013 65,000 26.6% 151,631 151,631
2013/2014 65,000 31.4% 178,682 178,682
2014/2015 65,000 27.1% 154,159 154,159
2015/2016 65,000 30.5% 174,228 174,228
2016/2017 (8) 65,000 18.9% * 71,970 61,792
Annual Totals to end Nov-16 138,002127,824
Rolling Load Factor28.3 %
Annual Load Factor to end Nov-1624.2 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.