RO Period Capacity (kW) Load Factor MWh ROCs
2003/2004 (9) 3,995 75.3% * 26,344 26,344
2004/2005 49,815 75.3% 328,479 328,479
2005/2006 85,775 75.3% 565,598 565,598
2006/2007 10,129 75.3% 66,793 66,793
2007/2008 77,160 75.3% 508,793 508,793
2008/2009 117,770 75.3% 776,570 776,570
2009/2010 126,823 71.1% 790,095 407,082
2010/2011 278,800 81.8% 1,996,980 1,012,350
2011/2012 327,291 81.4% 2,333,030 1,195,040
2012/2013 124,460 82.4% 898,861 480,268
2013/2014 3,291 82.0% 23,645 17,891
2014/2015 (11) 209,061 83.6% * 1,530,130 1,376,190
2015/2016 541,610 77.5% 3,675,320 3,308,470
2016/2017 (9) 602,397 63.4% * 3,346,420 3,011,800
Annual Totals to end Dec-16 4,631,6904,168,690
Rolling Load Factor76.8 %
Annual Load Factor to end Dec-1666.9 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.