R00103SQSC G01563NWSC : Crystal Rig II Wind Farm

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2009/2010 (3) 138,000 5.0% * 14,996 14,996
2010/2011 138,000 24.8% 299,908 299,908
2011/2012 138,000 34.7% 420,051 420,051
2012/2013 138,000 27.6% 333,480 333,480
2013/2014 138,000 34.6% 417,936 417,936
2014/2015 138,000 30.1% 364,239 364,239
2015/2016 138,000 29.4% 356,040 356,040
2016/2017 (7) 138,000 19.5% * 138,493 120,907
Annual Totals to end Oct-16 331,238313,652
Rolling Load Factor30.3 %
Annual Load Factor to end Oct-1627.3 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.