RO Period Capacity (kW) Load Factor MWh ROCs
2002/2003 (3) 3,761 36.5% * 12,026 12,026
2003/2004 (8) 31,678 36.5% * 101,304 101,304
2004/2005 89,995 36.5% 287,797 287,797
2005/2006 89,030 36.5% 284,712 284,712
2006/2007 130,080 36.5% 415,985 415,985
2007/2008 (9) 49,338 36.5% * 157,778 157,778
2008/2009 46,981 36.5% 150,243 150,243
2009/2010 72,504 35.5% 225,230 112,615
2010/2011 35,798 45.5% 142,762 71,582
2011/2012 25,661 51.0% 114,596 58,902
2012/2013 (6) 3,381 60.2% * 17,839 9,500
Annual Totals to end Sep-12 80,77441,420
Rolling Load Factor36.9 %
Annual Load Factor to end Sep-1255.6 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.