R00108RAEN G00261BWEN : Cottam Power Station (RB) - A,B,C,E

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2004/2005 (10) 16,157 55.8% * 78,982 62,633
2005/2006 24,371 55.8% 119,136 119,136
2006/2007 15,930 55.8% 77,870 77,870
2007/2008 20,252 55.8% 98,998 98,998
2008/2009 44,542 55.8% 217,736 217,736
2009/2010 27,430 53.1% 127,638 65,187
2010/2011 35,158 59.0% 181,693 92,168
2011/2012 30,919 61.2% 165,760 82,880
2012/2013 22,990 65.1% 131,058 65,529
2013/2014 (11) 7,693 67.1% * 45,193 13,558
2014/2015 (11) 8,788 51.5% * 39,613 11,884
2015/2016 (10) 5,032 33.9% * 14,938 7,469
2016/2017 (2) 2,122 55.8% * 10,374 0
Annual Totals to end Oct-16 14,0401,833
Rolling Load Factor53.8 %
Annual Load Factor to end Oct-1620.5 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.