R00125RAEN G00537BWEN : Ferrybridge C Power Station - A,C,E

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2002/2003 (7) 35,072 42.7% * 131,106 131,106
2003/2004 84,254 42.7% 314,959 314,959
2004/2005 121,511 42.7% 454,234 454,234
2005/2006 137,232 42.7% 513,002 513,002
2006/2007 106,051 42.7% 396,439 396,439
2007/2008 60,017 42.7% 224,354 224,354
2008/2009 (11) 29,079 42.7% * 108,704 108,704
2009/2010 (11) 23,927 29.8% * 62,398 31,199
2010/2011 13,222 35.6% 41,202 20,601
2011/2012 (10) 23,145 49.9% * 101,082 50,541
2012/2013 (9) 11,380 59.3% * 59,154 29,577
Annual Totals to end Mar-13 59,15429,577
Rolling Load Factor40.0 %
Annual Load Factor to end Mar-1344.4 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.