RO Period Capacity (kW) Load Factor MWh ROCs
2004/2005 (3) 45,000 13.8% * 13,404 13,404
2005/2006 45,000 30.6% 120,674 120,674
2006/2007 45,000 29.6% 116,605 116,605
2007/2008 45,000 33.3% 131,465 131,465
2008/2009 45,000 31.5% 124,218 124,218
2009/2010 45,000 25.9% 102,182 102,182
2010/2011 45,000 24.3% 95,688 95,688
2011/2012 45,000 32.5% 128,621 128,621
2012/2013 45,000 28.7% 113,163 113,163
2013/2014 45,000 31.7% 124,986 124,986
2014/2015 45,000 27.3% 107,781 107,781
2015/2016 45,000 32.1% 126,703 126,703
2016/2017 (7) 45,000 23.7% * 54,743 44,481
Annual Totals to end Oct-16 128,612118,350
Rolling Load Factor29.7 %
Annual Load Factor to end Oct-1632.5 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.