R00161SQSC G01923NWSC : Fallago Rig

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2012/2013 (1) 144,000 18.5% * 19,802 19,802
2013/2014 144,000 36.2% 457,165 457,165
2014/2015 144,000 31.6% 399,239 399,239
2015/2016 144,000 28.3% 357,789 357,789
2016/2017 (7) 144,000 19.5% * 144,229 134,020
Annual Totals to end Oct-16 318,616308,407
Rolling Load Factor31.8 %
Annual Load Factor to end Oct-1625.2 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.