R00170SQSC G01758NWSC : Gordonbush Wind Farm

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2011/2012 (4) 71,750 24.9% * 52,380 52,380
2012/2013 71,750 30.4% 191,250 191,250
2013/2014 71,750 31.9% 200,283 200,283
2014/2015 71,750 29.7% 186,517 186,517
2015/2016 71,750 30.0% 189,056 189,056
2016/2017 (9) 71,750 29.0% * 136,353 136,353
2017/2018 (6) 71,750 25.5% * 79,819 57,504
Annual Totals to end Nov-17 157,688135,373
Rolling Load Factor28.3 %
Annual Load Factor to end Nov-1725.1 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.