R00176SQSC G01765NWSC : Hill of Towie Wind Farm

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2011/2012 (3) 48,300 6.6% * 6,962 6,962
2012/2013 48,300 22.1% 93,528 93,528
2013/2014 48,300 31.1% 131,631 131,631
2014/2015 48,300 27.7% 117,028 117,028
2015/2016 48,300 28.0% 118,778 118,778
2016/2017 48,300 25.6% 108,515 108,515
2017/2018 48,300 29.3% 123,828 123,828
Annual Totals to end Apr-18 118,295111,384
Rolling Load Factor27.6 %
Annual Load Factor to end Apr-1828.0 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.