R00186SQSC G01924NWSC : Baillie Wind farm

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2012/2013 (1) 52,500 0.9% * 346 346
2013/2014 52,500 29.7% 136,618 136,618
2014/2015 52,500 30.8% 141,482 141,482
2015/2016 52,500 30.8% 141,857 141,857
2016/2017 52,500 28.6% 131,338 131,338
2017/2018 (9) 52,500 31.5% * 109,243 70,686
Annual Totals to end Dec-17 148,506109,949
Rolling Load Factor30.6 %
Annual Load Factor to end Dec-1732.3 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.