R00200RQEN G01481NWEN : Scout Moor Wind Farm

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2008/2009 (10) 65,000 16.6% * 78,565 78,565
2009/2010 65,000 25.1% 142,749 142,749
2010/2011 65,000 23.1% 131,617 131,617
2011/2012 65,000 30.1% 171,884 171,884
2012/2013 65,000 29.2% 166,348 166,348
2013/2014 65,000 31.8% 181,319 181,319
2014/2015 65,000 27.3% 155,339 155,339
2015/2016 65,000 30.0% 171,455 171,455
2016/2017 (6) 65,000 22.3% * 63,745 63,745
Annual Totals to end Sep-16 170,655170,655
Rolling Load Factor27.7 %
Annual Load Factor to end Sep-1629.9 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.