R00212SQSC G02003NWSC : Mid Hill Wind Farm

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2013/2014 (4) 75,900 7.8% * 17,165 15,449
2014/2015 75,900 25.4% 168,758 151,884
2015/2016 75,900 32.3% 215,613 194,054
2016/2017 75,900 28.1% 186,851 168,168
2017/2018 (8) 75,900 28.2% * 125,320 92,081
Annual Totals to end Nov-17 200,729159,950
Rolling Load Factor29.4 %
Annual Load Factor to end Nov-1730.2 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.