R00224SQSC G01959NWSC : Harestanes Windfarm

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2013/2014 (7) 140,760 7.6% * 54,309 54,309
2014/2015 140,760 19.5% 240,413 240,413
2015/2016 140,760 18.0% 222,421 222,421
2016/2017 (7) 140,760 13.7% * 98,751 83,695
Annual Totals to end Oct-16 211,618196,562
Rolling Load Factor18.1 %
Annual Load Factor to end Oct-1617.1 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.