R00237SQSC G02035NWSC : Berry Burn Wind Farm

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2013/2014 (2) 66,700 19.4% * 18,329 16,496
2014/2015 66,700 26.5% 155,038 139,536
2015/2016 66,700 30.1% 176,299 158,671
2016/2017 66,700 24.0% 140,314 126,284
2017/2018 (9) 66,700 29.3% * 128,873 84,085
Annual Totals to end Dec-17 169,190120,371
Rolling Load Factor27.7 %
Annual Load Factor to end Dec-1729.0 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.