R00257SQSC G02219NWSC : Dungavel

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2015/2016 (7) 26,000 37.6% * 49,912 44,921
2016/2017 26,000 35.5% 80,916 72,825
2017/2018 26,000 37.0% 84,221 75,800
Annual Totals to end May-18 86,14964,424
Rolling Load Factor36.6 %
Annual Load Factor to end May-1837.8 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.