R00308RQEN G02211NWEN : Middlemoor Wind Farm

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2013/2014 (10) 54,000 27.8% * 109,372 109,370
2014/2015 54,000 27.5% 130,164 130,164
2015/2016 54,000 29.8% 141,278 141,278
2016/2017 (7) 54,000 21.5% * 59,698 52,911
Annual Totals to end Oct-16 140,567133,780
Rolling Load Factor29.1 %
Annual Load Factor to end Oct-1629.6 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.